Plant and equipment

Equipment hire cost calculator.

Compare equipment hire quotes over the same period. Include operating hours, transport and other charges to see what each quote will cost.

FreeNo account neededExcel or print to PDF

Enter details

creweld · Free site tools

Equipment hire cost calculator

Use the same VAT basis for every rate. Monthly hire is charged in full periods, including the last partial period. Blank or zero rates are left out. Transport and other costs are added once to each quote.

This document uses the information entered on the form.

Instructions

Compare the cost of hire

Use your supplier’s rates and the number of days the equipment will be on site.

  1. 01

    Enter the hire period and operating hours per day. Fill in the hourly, daily or monthly quotes you want to compare and leave the others blank.

  2. 02

    For hourly hire, multiply days by hours per day and the hourly rate. For daily hire, multiply days by the daily rate. Monthly hire uses whole billing periods, rounded up.

  3. 03

    Set the length of the monthly billing period. Transport and other charges are added once per quote.

Common questions

Is the final month charged pro rata?

No. A 31-day hire on 30-day terms costs two monthly periods. Adjust the period or price if your supplier uses different terms.

Where do the rates and VAT figures come from?

Enter the rates from your quotes. Use either VAT-inclusive or VAT-exclusive figures consistently across all options.

Creweld for your site team

See how a site team keeps attendance records and shares work in Creweld.

CREWELD DEMO

Show us how your site works

How do you keep attendance records and assign work today? Those are good places to start a demo.

All fields are required.

This form is a preview. It doesn’t send or store your details.