Site records
Request for information (RFI).
Ask the design team for a detail, decision or revised drawing. Put the drawing reference, question, recipient and response deadline on one form.
Enter details
Request for information (RFI)
This document uses the information entered on the form.
Write an RFI the design team can answer
Use a separate request for each issue so the answer can be tied to the right drawing.
- 01
Enter the project, RFI number, date, subject and names. Add the drawing or document reference if one applies.
- 02
State what you need clarified. Give the team a response date when the answer affects work on site.
- 03
When a reply arrives, record the decision and generate a new copy. Share the Excel file or PDF through your usual project channel.
Common questions
Does the form send the RFI?
Download the document and send it through your usual channel. The form does not send emails or notifications.
Who assigns the RFI number?
Enter the number from your project register. The form does not keep a central register or assign sequential numbers.