Site attendance

Keeping a reliable subcontractor crew register

Record who worked for which subcontractor, on which site and on what dates. Use those assignments to check daily rosters and tag handovers.

A site supervisor uses drawings and folders to review the division of work between two subcontractor crews.

On the same site, formwork crews, steel fixers, electricians and mechanical teams may work side by side. People change employers or move to the next job. Within weeks, the current roster can tell you very little about an earlier shift.

Build the register around people, their dated assignments and the site contact who can answer for each crew.

Separate the subcontractor from the worker

Give the company, the person and the site their own fields. Link them through an assignment. A company name change should take one edit, however many people it employs on the job.

Name a site contact for each subcontractor. Agree who reports new starters, records departures and resolves a disputed entry. A long list of numbers is little help if nobody knows whom to call.

Date every change of crew

A worker can spend half the month with one subcontractor and the rest in another crew. End the first assignment and start the next one on the appropriate date. Editing the company name on past entries would erase the distinction.

Suppose someone worked with crew A on Monday and joined crew B on Wednesday. The two daily reports should list that person under different crews.

Record tag issues and returns

Cards and BLE tags change hands. On issue, record the device ID or serial number, the person receiving it and the start time. Close the assignment on return so there is never any doubt about who has it.

If everyone leaves their tags on the desk overnight, a worker might pick up the wrong one in the morning. A short issue check takes less effort than untangling the reports later.

  • Match the ID on the tag to the issue record.
  • Make sure the previous assignment has ended.
  • Confirm the new wearer's subcontractor and site.
  • Check that earlier readings still belong to the previous assignment.

The daily roster check

Which crews have reported in? Which expected crews have no recent entry? Which changes are waiting for confirmation? Take those questions to the relevant site contact.

Compare the morning plan with the number of distinct workers recorded during the day. A difference calls for a check for late starters, coverage gaps or upload delays before anyone records an absence or a labour shortage.

Preparing the weekly report

Show each subcontractor's daily headcount alongside unresolved entries. Count repeat readings for one person once per day. If someone worked on two sites, explain how that person counts in the company total.

A report can inform a labour or payment review. Approved time, measured work, contract terms and authorisation still need separate consideration. Put the period and the type of record in the report title.

Common questions

Can one worker be assigned to two sites?

Yes. Record the date and site of each assignment. State whether the headcount covers one site or the company when you count distinct workers.

How often should the register change?

Update it when someone starts, leaves or is reassigned. A brief check at the beginning of each shift picks up changes that have yet to reach the register.

Creweld on site

Discuss your site with us

Tell us how you organise crews and hand work over. We can use your day on site as the starting point for a demo.

CREWELD DEMO

Show us how your site works

How do you keep attendance records and assign work today? Those are good places to start a demo.

All fields are required.

This form is a preview. It doesn’t send or store your details.