What should head office review across construction sites?
Make headcounts, delayed tasks and equipment bookings comparable across sites. Show when each figure was updated and which records are missing.

On one project, a manager can often fill a gap with a phone call. Across several projects, chasing updates can take much of the day. The first view should tell head office which site needs a decision.
Agree what each site reports, who updates it and how often. A shared spreadsheet with different counting rules will still give misleading totals.
Put exceptions where managers can see them
Keep a common set of questions for the first review. Let the site manager inspect the underlying detail while the central team looks at exceptions.
Scroll sideways to see the rest of the table.
| Subject | Question | Supporting detail |
|---|---|---|
| Workers and crews | Which crews have reported in? | Time and source of the reading |
| Late work | Which job is holding up the next one? | Owner and reason for delay |
| Open blockers | Which decision does head office need to make? | Decision owner and expected date |
| Equipment plan | Are two sites asking for the same vehicle? | Site and required time slot |
| Record freshness | Which sites have stopped sending current information? | Last update and person responsible for checking |
Give daily and weekly reviews different jobs
Discuss new blockers, today's decisions and upcoming equipment moves in the daily call. Reserve recurring delays, longstanding open jobs and changes to the plan for the weekly review.
If a site has no crew readings today, check the receiver or reporting channel first. At the end of the week, check how often it happened and what interrupted reporting.
Keep the selected site and access rights visible
A manager covering every site and a supervisor looking after one crew need different access to workers, messages and documents. Review permissions when someone moves to another project.
When you switch sites, check the lists and reports as well as the heading. An old filter can make a manager draw a conclusion about the wrong site. Keep the company, site and period in view.
Compare like with like
A raw count of completed tasks can misrepresent two sites with different crew sizes, construction phases, task sizes or recording habits. Agree on the definition and reporting period before interpreting the numbers.
Start with two sites and a few measures. After a week, keep the information that led to a decision and revisit anything that simply occupied space.
Common questions
Does head office need the detail of every task?
Where access permits, a manager can drill into individual jobs. It is usually more useful to see overdue, blocked and decision-dependent work first.
Can we add up the headcounts from several sites?
Define the time period and how you count the same person across sites. Otherwise a worker recorded at two projects can appear twice in the company total.