Site management

What should head office review across construction sites?

Make headcounts, delayed tasks and equipment bookings comparable across sites. Show when each figure was updated and which records are missing.

A site manager reviews three concrete building models against the same plan.

On one project, a manager can often fill a gap with a phone call. Across several projects, chasing updates can take much of the day. The first view should tell head office which site needs a decision.

Agree what each site reports, who updates it and how often. A shared spreadsheet with different counting rules will still give misleading totals.

Use definitions everyone can apply

At one site an “active worker” may be anyone seen today. Elsewhere it may mean everyone on the register. Write short definitions for headcounts, task statuses and equipment use.

Give each measure a period and a site. Show when someone last updated it and flag missing information. That context makes even a small table useful.

Put exceptions where managers can see them

Keep a common set of questions for the first review. Let the site manager inspect the underlying detail while the central team looks at exceptions.

Scroll sideways to see the rest of the table.

Example cross-site review
SubjectQuestionSupporting detail
Workers and crewsWhich crews have reported in?Time and source of the reading
Late workWhich job is holding up the next one?Owner and reason for delay
Open blockersWhich decision does head office need to make?Decision owner and expected date
Equipment planAre two sites asking for the same vehicle?Site and required time slot
Record freshnessWhich sites have stopped sending current information?Last update and person responsible for checking

Give daily and weekly reviews different jobs

Discuss new blockers, today's decisions and upcoming equipment moves in the daily call. Reserve recurring delays, longstanding open jobs and changes to the plan for the weekly review.

If a site has no crew readings today, check the receiver or reporting channel first. At the end of the week, check how often it happened and what interrupted reporting.

Keep the selected site and access rights visible

A manager covering every site and a supervisor looking after one crew need different access to workers, messages and documents. Review permissions when someone moves to another project.

When you switch sites, check the lists and reports as well as the heading. An old filter can make a manager draw a conclusion about the wrong site. Keep the company, site and period in view.

Compare like with like

A raw count of completed tasks can misrepresent two sites with different crew sizes, construction phases, task sizes or recording habits. Agree on the definition and reporting period before interpreting the numbers.

Start with two sites and a few measures. After a week, keep the information that led to a decision and revisit anything that simply occupied space.

Common questions

Does head office need the detail of every task?

Where access permits, a manager can drill into individual jobs. It is usually more useful to see overdue, blocked and decision-dependent work first.

Can we add up the headcounts from several sites?

Define the time period and how you count the same person across sites. Otherwise a worker recorded at two projects can appear twice in the company total.

Creweld on site

Discuss your site with us

Tell us how you organise crews and hand work over. We can use your day on site as the starting point for a demo.

CREWELD DEMO

Show us how your site works

How do you keep attendance records and assign work today? Those are good places to start a demo.

All fields are required.

This form is a preview. It doesn’t send or store your details.